Pitman Schedule: the 2-2-3 with Fixed Day and Night Crews
Same 2-2-3 rhythm, one big difference: nobody flip-flops between days and nights. Generate your fixed-crew roster below — free, no signup.
September 2026
Pitman Schedule| Sun | Mon | Tue | Wed | Thu | Fri | Sat |
|---|---|---|---|---|---|---|
| 1 ADayBOffCNightDOff | 2 ADayBOffCNightDOff | 3 AOffBDayCOffDNight | 4 AOffBDayCOffDNight | 5 ADayBOffCNightDOff | ||
| 6 ADayBOffCNightDOff | 7 AOffBDayCOffDNight | 8 AOffBDayCOffDNight | 9 AOffBDayCOffDNight | 10 ADayBOffCNightDOff | 11 ADayBOffCNightDOff | 12 AOffBDayCOffDNight |
| 13 AOffBDayCOffDNight | 14 ADayBOffCNightDOff | 15 ADayBOffCNightDOff | 16 ADayBOffCNightDOff | 17 AOffBDayCOffDNight | 18 AOffBDayCOffDNight | 19 ADayBOffCNightDOff |
| 20 ADayBOffCNightDOff | 21 AOffBDayCOffDNight | 22 AOffBDayCOffDNight | 23 AOffBDayCOffDNight | 24 ADayBOffCNightDOff | 25 ADayBOffCNightDOff | 26 AOffBDayCOffDNight |
| 27 AOffBDayCOffDNight | 28 ADayBOffCNightDOff | 29 ADayBOffCNightDOff | 30 ADayBOffCNightDOff |
What is the Pitman schedule?
The Pitman schedule is a 2-2-3 rotation with one rule changed: crews are permanently assigned to day shift or night shift and never rotate between them. Four crews cover a 24/7 operation on 12-hour shifts — two day crews and two night crews. Every crew works the same 2 on, 2 off, 3 on, 2 off, 2 on, 3 off rhythm over 14 days; the day crews and night crews simply run it in parallel, mirrored.
Fixed crews vs. rotating crews
In a rotating 2-2-3, every crew swings between days and nights every cycle or two. Workers' body clocks never settle, and the swing week is notorious for fatigue. The Pitman variant removes the swing entirely: day people live on days, night people live on nights, and sleep patterns can actually stabilize. The price is fairness — night crews carry the permanent night-shift burden, so Pitman shops almost always pay a night differential (typically 5–15% on top of base) and many let workers bid into day slots by seniority.
Some departments run a middle path: fixed for a quarter or a year, then crews bid again. That keeps the stability benefit while giving night crews a horizon.
The hours: 60/24 alternating weeks
Every crew works 7 shifts per 14 days — 84 hours, averaging 42 per week. Aligned to a Monday start, that is a 60-hour week followed by a 24-hour week: the long week works Monday, Tuesday, Friday, Saturday, and Sunday; the short week is just Wednesday and Thursday. You may see Pitman hours quoted elsewhere as 36 and 48 — that arithmetic contradicts the pattern itself; 60/24 is the only split consistent with 7 shifts per 14 days, and it is the same math as every 2-2-3 family pattern.
Who uses the Pitman schedule
Police departments are the canonical Pitman users — patrol squads where permanent days and permanent nights simplify supervision, court scheduling, and training. EMS agencies and hospital units use it for the same reason: specialized teams (night ICU, day clinic) keep their identity instead of dissolving into a rotation. Dispatch and 911 call centers favor it because permanent night dispatchers stop churning out. Manufacturing plants that adopted 2-2-3 but fought the day/night flip-flop frequently end up on Pitman within a year.
Pitman vs. 2-2-3 vs. Panama
The three names all describe the same 14-day rhythm of work and rest. The difference is crew assignment: 2-2-3 is the generic name, Panama is the same pattern by its regional nickname, and Pitman specifically means the fixed day/night crew version. If your workplace says "we run Pitman," expect a night differential and a bidding process; the generator above assumes exactly that setup.
Make yours
Set the first day of Crew A's cycle above, generate, and print — each squad gets its own copy. Planning ahead? The Pitman schedule 2026 page has the whole year pre-baked. All five patterns build from the same rotating shift schedule generator on the home page.
Pitman schedule FAQ
Is the Pitman schedule the same as 2-2-3?
Same rhythm, different crew assignment. Both run 2 on, 2 off, 3 on, 2 off, 2 on, 3 off over 14 days. "Pitman" specifically means crews are fixed to day or night shifts permanently; generic "2-2-3" may or may not rotate crews between days and nights.
How many hours a week do you work on Pitman?
84 hours per 14 days, averaging 42 per week. With a Monday cycle start the weeks alternate 60 hours and 24 hours. Claims of 36/48-hour weeks contradict the pattern's own structure — 7 shifts per 14 days is the only math that adds up.
Do night crews ever rotate to days?
Not in a true Pitman setup — that is the whole point. Many departments reopen bidding quarterly or annually so night crews can move to days by seniority, but between bids the assignment is fixed and body clocks can stabilize.
Is there usually a night differential?
Almost always. Because Pitman assigns nights permanently, employers typically pay a shift differential — commonly 5–15% on top of base pay — to keep night crews staffed and compensate for the long-term burden.
Who uses the Pitman schedule most?
Police patrol squads, EMS agencies, hospital units, and 911 dispatch centers — operations where specialized day and night teams are an advantage rather than a fairness problem. Manufacturing plants that dislike 2-2-3's day/night swing often migrate to Pitman.
What is the difference between Pitman and Panama?
Panama is simply the regional nickname for the 2-2-3 rotation. Pitman is the fixed-crew variant of that same rotation. Same 14-day calendar math; the difference is whether your crew ever switches between days and nights.