4 On 4 Off Schedule: the 16-Day Full Cycle

4 days on, 4 off, 4 nights on, 4 off — and two genuine 4-day breaks in every cycle. Generate your crew calendar below — free, no signup.

Tip: choose “Save as PDF” in the print dialog for a high-resolution file.
Day shift Night shift Off

September 2026

4 On 4 Off Schedule
SunMonTueWedThuFriSat
1
AOffBNightCOffDDay
2
ANightBOffCDayDOff
3
ANightBOffCDayDOff
4
ANightBOffCDayDOff
5
ANightBOffCDayDOff
6
AOffBDayCOffDNight
7
AOffBDayCOffDNight
8
AOffBDayCOffDNight
9
AOffBDayCOffDNight
10
ADayBOffCNightDOff
11
ADayBOffCNightDOff
12
ADayBOffCNightDOff
13
ADayBOffCNightDOff
14
AOffBNightCOffDDay
15
AOffBNightCOffDDay
16
AOffBNightCOffDDay
17
AOffBNightCOffDDay
18
ANightBOffCDayDOff
19
ANightBOffCDayDOff
20
ANightBOffCDayDOff
21
ANightBOffCDayDOff
22
AOffBDayCOffDNight
23
AOffBDayCOffDNight
24
AOffBDayCOffDNight
25
AOffBDayCOffDNight
26
ADayBOffCNightDOff
27
ADayBOffCNightDOff
28
ADayBOffCNightDOff
29
ADayBOffCNightDOff
30
AOffBNightCOffDDay
Every day: one crew on days, one on nights, two crews off.

What is the 4 on 4 off schedule?

The 4 on 4 off schedule covers a 24/7 operation with four crews of 12-hour workers. The full version runs on a 16-day cycle: each crew works 4 consecutive day shifts, takes 4 days off, works 4 consecutive night shifts, then takes 4 more days off. Crews are offset by 4 days from each other, so on any given day exactly one crew is on days, one is on nights, and two are resting.

4 on 4 off schedule: one full 16-day cycle for 4 crews — 4 day shifts, 4 off, 4 night shifts, 4 off, crews offset by 4 daysCrew ACrew BCrew CCrew DDayNightOff
One full 16-day 4 on 4 off cycle, all 4 crews. Every crew gets two 4-day breaks per cycle; the day↔night swing sits between them.

How the 16-day cycle works

Each crew works 8 shifts per 16 days — 96 hours, an average of 42 hours per week, exactly like the DuPont and 2-2-3 patterns. What makes 4 on 4 off feel different is the shape of rest: two 4-day breaks in every cycle. With a single day of annual leave stapled to either end, a 4-day break becomes a 5-day mini-vacation, several times per quarter.

Because the cycle length (16 days) is not a multiple of 7, rest days drift through the week — there is no permanently fixed weekday off, and no weekend guarantee. Workers trade weekend predictability for the two long breaks.

The 8-day simplified variant

Many workplaces advertise "4 on 4 off" but actually run an 8-day version: 4 shifts on, 4 off, with crews permanently fixed to days or nights (like Pitman but in blocks of 4). That variant is simpler to explain and removes the day↔night swing, but the math changes: 4 crews on an 8-day cycle means each crew works half of all days — 182.5 shifts a year, roughly 2,190 hours, far above the 42-hour average. Full 24/7 coverage with a humane workload needs either the 16-day cycle above or a 5th crew. The generator on this page runs the true 16-day, 4-crew version.

Fatigue: the honest picture

Four consecutive 12-hour shifts is a long stretch, and the fourth night of a 4-night run is where fatigue peaks. The mitigations are structural: the day↔night transition always happens across a 4-day break (never a quick turnaround), and the 4 nights are bracketed by 8 days of rest per cycle. Workers consistently rate the pattern better for sleep than fast-rotating schedules, and worse than slow weekly rotations. If your operation is fatigue-critical, rotate days→nights forward through the break — exactly as this pattern does — and avoid overtime call-ins on day 3 and 4 of each block.

Who uses it

Fire and EMS agencies, offshore and maritime crews, security operations, data centers, and manufacturing plants that want longer rest blocks than 2-2-3 provides. It is especially common in the UK and Australia under the name "4 on 4 off," and gaining ground in U.S. 24/7 facilities where recruitment hinges on time off.

Make yours

Set the first day of Crew A's cycle above, generate, and print — or save a PDF per crew. Planning the whole year? The 4 on 4 off schedule 2026 page has all 12 months pre-baked. All five patterns build from the same rotating shift schedule generator on the home page.

4 on 4 off schedule FAQ

How many hours a week do you work on 4 on 4 off?

On the full 16-day cycle: 8 shifts of 12 hours per 16 days, averaging 42 hours per week — the same average as DuPont and 2-2-3. The shape differs: weeks alternate between 48-hour blocks and zero-hour breaks.

Is 4 on 4 off an 8-day or 16-day cycle?

Both exist. The 16-day full cycle (4 days, 4 off, 4 nights, 4 off) is the true 4-crew 24/7 version and is what this generator produces. The 8-day variant (4 on, 4 off, fixed days or nights) needs a 5th crew to cover 24/7 without overworking everyone.

Do you get weekends off on 4 on 4 off?

There is no fixed weekday off — the 16-day cycle drifts through the calendar. Roughly half of all weekend days are worked, but every cycle includes two 4-day breaks that regularly land on weekends by rotation.

Is 4 on 4 off bad for fatigue?

Four consecutive 12-hour nights is the hardest part, and day 4 of any block is where fatigue peaks. The pattern compensates structurally: every day↔night swing happens across a 4-day break, so there are no quick turnarounds, and each cycle carries 8 full rest days.

What is the difference between 4 on 4 off and DuPont?

Both are 4-crew, 12-hour rotations averaging 42 hours a week. DuPont ends every 28 days with a 7-day break and repeats the same weekday pattern; 4 on 4 off gives two 4-day breaks every 16 days but drifts through the week, and swaps between days and nights mid-cycle.

Can a 4-crew 4 on 4 off cover 24/7 with 8-hour shifts?

No — 4 crews can cover 24/7 only on 12-hour shifts (2 shifts per day). With 8-hour shifts you need 3 shifts per day, which requires at least 6 crews on a 4 on 4 off rhythm.